Displayed 1 - 10 of 481
FAQ
?A beneficiary who has no errors or violations in construction. Will the beneficiary be violated if does not obtain a compliance certificate
Yes, if the building is among the buildings specified for applying the compliance certificate, the certificate must be issued.
FAQ
A building permit has been issued, and I want to add a role and delete a component, which is the appendix. What should I do?
You can amend the building permit after issuance by applying for the service of adding and amending building components.
FAQ
a cadastral decision has been issued, and the client has purchased the land adjacent to him and wants to annex the plot adjacent to the cadastral decision. What is the procedure?
The plots must be merged first, after applying for another cadastral decision.
Page
Page
FAQ
?Are all old and new buildings (residential or commercial) required to obtain a CBC Certificate
Buildings located on the streets and roads shown in the Geographical Explorer of the Building Compliance Certificate shall obtain a CBC certificate.
FAQ
?Are buildings under construction required to obtain a CBC Certificate
The CBC Certificate shall be issued directly for new buildings along with the issuance of the Occupancy Certificate.
FAQ
Are electronic contracts verified?
Yes, they are verified by the Ministry of Justice.
FAQ
Are excavation permit violations related to cable cuts under the Communications and Information Technology Commission (CITC) distinguished in the system?
Yes, violations related to CITC cable cuts can be viewed in multiple sections of the excavation platform:
• Through the "Permit Compliance Status" filter on the Excavation Permits screen (users can search for all violations, only CITC cable cut violations, or permits without recorded violations).
• Through the "Violation Type" filter on the Monitoring and Quality screen (users can filter for all violations or specifically CITC cable cut violations).
• Through the interactive permit map, where compliance status is visually marked. When clicking on an excavation path, its details are displayed, showing whether there are recorded violations. If none exist, "No recorded violations" is displayed. If violations exist, a link appears for the recorded violation, allowing users to view its details on the Monitoring and Quality screen.
• Through the "Permit Compliance Status" filter on the Excavation Permits screen (users can search for all violations, only CITC cable cut violations, or permits without recorded violations).
• Through the "Violation Type" filter on the Monitoring and Quality screen (users can filter for all violations or specifically CITC cable cut violations).
• Through the interactive permit map, where compliance status is visually marked. When clicking on an excavation path, its details are displayed, showing whether there are recorded violations. If none exist, "No recorded violations" is displayed. If violations exist, a link appears for the recorded violation, allowing users to view its details on the Monitoring and Quality screen.
FAQ
?Are existing buildings required to obtain the CBC
Yes, buildings shall be required to meet all the standards required to obtain a CBC after the expiry of the remedy period for the buildings specified in the Geographical Explorer for the CBC on the Balady platform.