Search

  • حفظ الصفحة
  • 0
    No votes submitted yet.
Displayed 261 - 270 of 411
Search
تاريخ التحديث
FAQ

What are the conditions for modifying housing units from two to three units?

There are no requirements, and the modification is done through the service of adding and modifying building components.
FAQ

What are the conditions for reserving a site for a mobile cart license?

● The mobile cart license must be valid (not expired or canceled).
● The current site reservation must be valid (not expired or canceled).
FAQ

What are the consequences of canceling the Project Coordination Report?

After the coordination report is canceled, the following occurs:
● The project owner is notified of the cancellation.
● Printing of the coordination report is no longer available.
● The project site becomes available for coordination requests from other entities (government or private sector).
● The canceled report cannot be used to obtain a building permit.
FAQ

What are the fees for canceling a mobile cart license that expired after 06/ Jumada Al-Awwal / 1442H (21/Dec/2020)?

Fees include:

○ Non-renewal penalty (500 SAR) + Inspection fee (20 SAR) – one-time
charge
○ ((Signboard fee + 200 SAR) * (1 year))
FAQ

What are the key requirements for applying for a Multi-Building Connection Excavation Permit?

The key requirements include:
1. Defining the main excavation route and all building connections.
2. For each building, the short address or building number must be entered, along with an image of the building.
3. Excavation paths must remain within the designated geographic scope of the buildings.
4. The number of connections must not exceed 80.
5. The length of each connection must not exceed 25 meters.
6. The total length of the main excavation route must not exceed 1,000 meters
FAQ

What are the mandatory details required to inquire about a building permit?

The permit number (issued by Balady or the municipality), the owner’s identification type, and the owner’s identification number.
FAQ

What are the mandatory fields required to inquire about the cadastral report?

The mandatory fields include the cadastral report number (whether issued by Balady
or the Municipality), the owner’s ID type, and the owner’s ID number.
FAQ

What are the reasons a contractor might be banned?

1. Expired permits not closed on the platform
2. Incomplete or abandoned work at the site
3. Outdated classification or qualification
4. Accumulated unresolved site reports
5. Previous excavation defects not corrected
6. Safety violations at the work site
7. Failure to follow approved excavation plans
8. Other reasons specified by the Coordination Office
FAQ

What are the required details for a trailer?

Length, width, and height of the trailer.
FAQ

What are the required details for a vehicle?

Length, width, height, model, manufacturing year, license plate number, and chassis number.

Comments & suggestions

For any inquiries or comments on municipal services, please fill in the required information

Contact Us

Last update date: - Saudi Arabia
Was this page useful?

Please tell us why (select up to two options)

Please do not include personal or financial information. Your comment will be sent and recorded for the purpose of improving the services on balady platform.

Please do not include personal or financial information. Your comment will be sent and recorded for the purpose of improving the services on balady platform.

Enter the characters shown in the image.
1 visitors said yes from
1485584
1 responses
1485584