Displayed 191 - 200 of 823
FAQ
I have been issued a building permit and now wish to add a floor and remove a component (e.g., a rooftop annex). What should I do?
You can modify the building permit after issuance by applying for the Addition and Modification of Building Components service.
FAQ
Do I need to fence my land if it is located outside the designated cities?
No, fencing is not required, and penalties do not apply. However, the landowner may still request a Vacant Land Fencing Permit voluntarily.
FAQ
Is a container rental contract required to issue a Vacant Land Fencing Permit?
Yes, as per municipal regulations, it is a mandatory requirement for obtaining the permit, and it must be issued by an approved engineering office.
FAQ
How can I inquire about the requirements for a commercial activity?
You can inquire by accessing the Balady portal → Electronic Inquiry → Commercial Activities and Municipal Requirements, then searching by activity name or activity code and clicking Search to display the details and municipal requirements for the selected activity.
Service
Commercial Activities and Municipal Requirements
An electronic service provided through the Balady platform that allows users to inquire about municipal requirements for commercial activities without the need to visit the relevant authority.
FAQ
Can I obtain a building permit online?
Yes, by following these steps:
1. Log in via the Balady platform using Unified National Access (Absher).
2. Navigate to services and select Building Permit Services.
3. Choose the type of permit (Building Permit or Fencing Permit).
4. Identify the property owner and the applicant.
5. Select the survey decision for the permit request.
6. Complete the required fields and submit them to the engineering office.
7. After payment, the Building Permit is issued and can be printed.
1. Log in via the Balady platform using Unified National Access (Absher).
2. Navigate to services and select Building Permit Services.
3. Choose the type of permit (Building Permit or Fencing Permit).
4. Identify the property owner and the applicant.
5. Select the survey decision for the permit request.
6. Complete the required fields and submit them to the engineering office.
7. After payment, the Building Permit is issued and can be printed.
FAQ
Is the service for changing the supervising office or contractor available through the Balady mobile app?
No, this service is only available through the Balady platform.
FAQ
Who is authorized to submit a request to change the supervising office and contractor?
The permit owner or their representative can submit a request to change the supervising office or contractor, and the request is approved by the municipality.
FAQ
Can I inquire about permits issued by Riyadh Municipality?
Yes, the service allows inquiries about building permits issued by all municipalities across the Kingdom.
FAQ
How can a business qualify for a Self-Service Machine Permit?
1. The license activity must allow for a self-service machine permit.
2. There must be no pending self-service machine permit applications in (draft/under review) status.
3. The permit must be requested for a shop license.
4. The maximum allowed number of active permits for the license must not be exceeded.
2. There must be no pending self-service machine permit applications in (draft/under review) status.
3. The permit must be requested for a shop license.
4. The maximum allowed number of active permits for the license must not be exceeded.