Search

  • حفظ الصفحة
  • 0
    No votes submitted yet.
Displayed 111 - 120 of 823
Search
تاريخ التحديث
Order
FAQ

What is the cancellation service for a temporary license for a mobile store sales outlet?

This service allows the cancellation of a temporary sales outlet license within the
municipal incubators for commercial activities.
FAQ

What is the "Adding Technical Institute Graduates" screen?

This feature was added to enable accredited institute representatives to register their trained graduates in the system.
FAQ

What is the acceptable spacing between excavation paths within a single excavation site?

The acceptable distance between excavation paths within a single site is 50 meters.
FAQ

What is required to quickly process a communication?

The availability of sufficient justifications that necessitate the submission of the communication, with the need for accuracy and validity of the data, especially the location of the communication, and the classification corresponding to the monitored case contributes to resolving deficiencies effectively and quickly.
FAQ

What is meant by the "distinctive mark" in a seasonal permit application?

The applicant must enter a description of the seasonal permit location or provide a distinctive mark for the site.
FAQ

What is meant by fencing the earth into space?

It is for the landowner to issue a license for fencing a vacant land and fencing the land belonging to him in accordance with the (Guideline for fencing vacant lands) issued by the Ministry of Municipalities & Housing (https://balady.gov.sa/Services/DownloadUserGuide/364).
FAQ

What is meant by coordination and approval entities?

These are relevant entities that must be consulted for opinions on major project coordination. Their input may directly impact the approval or rejection of the request, categorizing them as an approval entity, or it may be advisory only, categorizing them as a coordination entity. Usually, coordination entities are the same as project-owning entities. Approval entities may vary depending on the nature of the request and the main municipality, but the (Project Coordination Office) remains the primary approval entity for all types of requests.
FAQ

What is meant by a "route"?

A route is a designated extended area along a street that includes parking spaces for a limited number of mobile carts. The municipality defines and determines the maximum capacity for each route.
FAQ

What is an occupancy certificate?

A building occupancy certificate is a certificate that confirms the actual completion of buildings and is issued by the competent authorities.
  • 823 results found

Comments & suggestions

For any inquiries or comments on municipal services, please fill in the required information

Contact Us

Last update date: - Saudi Arabia
Was this page useful?

Please tell us why (select up to two options)

Please do not include personal or financial information. Your comment will be sent and recorded for the purpose of improving the services on balady platform.

Please do not include personal or financial information. Your comment will be sent and recorded for the purpose of improving the services on balady platform.

Enter the characters shown in the image.
1 visitors said yes from
1485224
1 responses
1485224