What are the key requirements for applying for a Multi-Building Connection Excavation Permit?
The key requirements include:
1. Defining the main excavation route and all building connections.
2. For each building, the short address or building number must be entered, along with an image of the building.
3. Excavation paths must remain within the designated geographic scope of the buildings.
4. The number of connections must not exceed 80.
5. The length of each connection must not exceed 25 meters.
6. The total length of the main excavation route must not exceed 1,000 meters
1. Defining the main excavation route and all building connections.
2. For each building, the short address or building number must be entered, along with an image of the building.
3. Excavation paths must remain within the designated geographic scope of the buildings.
4. The number of connections must not exceed 80.
5. The length of each connection must not exceed 25 meters.
6. The total length of the main excavation route must not exceed 1,000 meters
FAQ
What are the mandatory details required to inquire about a building permit?
The permit number (issued by Balady or the municipality), the owner’s identification type, and the owner’s identification number.
FAQ
What are the mandatory fields required to inquire about the cadastral report?
The mandatory fields include the cadastral report number (whether issued by Balady
or the Municipality), the owner’s ID type, and the owner’s ID number.
or the Municipality), the owner’s ID type, and the owner’s ID number.
FAQ
What are the reasons a contractor might be banned?
1. Expired permits not closed on the platform
2. Incomplete or abandoned work at the site
3. Outdated classification or qualification
4. Accumulated unresolved site reports
5. Previous excavation defects not corrected
6. Safety violations at the work site
7. Failure to follow approved excavation plans
8. Other reasons specified by the Coordination Office
2. Incomplete or abandoned work at the site
3. Outdated classification or qualification
4. Accumulated unresolved site reports
5. Previous excavation defects not corrected
6. Safety violations at the work site
7. Failure to follow approved excavation plans
8. Other reasons specified by the Coordination Office
FAQ
What are the required details for a trailer?
Length, width, and height of the trailer.
FAQ
What are the required details for a vehicle?
Length, width, height, model, manufacturing year, license plate number, and chassis number.
FAQ
What are the requirements for a Certificate of Occupancy?
To issue a certificate of occupancy requires:
1- The existence of a previous license issued 6 months ago or more, and no occupancy certificate has been issued for it before.
2- Payment of service fees.
3- Contracting with an engineering office for non-residential uses.
4- Payment of violations.
1- The existence of a previous license issued 6 months ago or more, and no occupancy certificate has been issued for it before.
2- Payment of service fees.
3- Contracting with an engineering office for non-residential uses.
4- Payment of violations.
FAQ
What are the requirements for a site preparation permit?
● A survey decision for the site.
● Approval from the municipality or relevant authority.
● Approval from the municipality or relevant authority.
FAQ
What are the requirements for adding a consultant to the project team?
To add a consultant to the permit application project team, the following conditions must be met:
● A valid license number for the engineering consulting office must be available.
● A valid National Establishment Number (700 number) for the consulting office must be available.
● The classification must be valid.
● The consultant must be approved by the Coordination Office.
● A valid license number for the engineering consulting office must be available.
● A valid National Establishment Number (700 number) for the consulting office must be available.
● The classification must be valid.
● The consultant must be approved by the Coordination Office.
FAQ
What are the requirements for adding a consultant to the project team?
To add a consultant to the permit request team, the following requirements must be
met:
● Verification of a valid and active engineering consultancy office license
number.
● Verification of a valid and active National Establishment Number (700) for the
engineering consultancy office.
● Verification of the consultant's classification validity.
● The consultant must be approved by the Coordination Office.
met:
● Verification of a valid and active engineering consultancy office license
number.
● Verification of a valid and active National Establishment Number (700) for the
engineering consultancy office.
● Verification of the consultant's classification validity.
● The consultant must be approved by the Coordination Office.