What are the key requirements for applying for a Multi-Building Connection Excavation Permit?

The key requirements include:
1. Defining the main excavation route and all building connections.
2. For each building, the short address or building number must be entered, along with an image of the building.
3. Excavation paths must remain within the designated geographic scope of the buildings.
4. The number of connections must not exceed 80.
5. The length of each connection must not exceed 25 meters.
6. The total length of the main excavation route must not exceed 1,000 meters
FAQ

What are the mandatory details required to inquire about a building permit?

The permit number (issued by Balady or the municipality), the owner’s identification type, and the owner’s identification number.
FAQ

What are the mandatory fields required to inquire about the cadastral report?

The mandatory fields include the cadastral report number (whether issued by Balady
or the Municipality), the owner’s ID type, and the owner’s ID number.
FAQ

What are the reasons a contractor might be banned?

1. Expired permits not closed on the platform
2. Incomplete or abandoned work at the site
3. Outdated classification or qualification
4. Accumulated unresolved site reports
5. Previous excavation defects not corrected
6. Safety violations at the work site
7. Failure to follow approved excavation plans
8. Other reasons specified by the Coordination Office
FAQ

What are the required details for a trailer?

Length, width, and height of the trailer.
FAQ

What are the required details for a vehicle?

Length, width, height, model, manufacturing year, license plate number, and chassis number.
FAQ

What are the requirements for a Certificate of Occupancy?

To issue a certificate of occupancy requires:
1- The existence of a previous license issued 6 months ago or more, and no occupancy certificate has been issued for it before.
2- Payment of service fees.
3- Contracting with an engineering office for non-residential uses.
4- Payment of violations.
FAQ

What are the requirements for a site preparation permit?

● A survey decision for the site.
● Approval from the municipality or relevant authority.
FAQ

What are the requirements for adding a consultant to the project team?

To add a consultant to the permit application project team, the following conditions must be met:
● A valid license number for the engineering consulting office must be available.

● A valid National Establishment Number (700 number) for the consulting office must be available.

● The classification must be valid.

● The consultant must be approved by the Coordination Office.
FAQ

What are the requirements for adding a consultant to the project team?

To add a consultant to the permit request team, the following requirements must be
met:
● Verification of a valid and active engineering consultancy office license
number.
● Verification of a valid and active National Establishment Number (700) for the
engineering consultancy office.
● Verification of the consultant's classification validity.
● The consultant must be approved by the Coordination Office.
  • 823 results found

Comments & suggestions

For any inquiries or comments on municipal services, please fill in the required information

Contact Us

Last update date: - Saudi Arabia
Was this page useful?

Please tell us why (select up to two options)

Please do not include personal or financial information. Your comment will be sent and recorded for the purpose of improving the services on balady platform.

Please do not include personal or financial information. Your comment will be sent and recorded for the purpose of improving the services on balady platform.

Enter the characters shown in the image.
1 visitors said yes from
1484488
1 responses
1484488