- There is a survey decision entry service at the engineering office to enter the old survey decisions issued by the GAM system.
- You can apply for the service of amending a cadastral decision before issuing a permit on the decision.
- The validity period of the cadastral decision is 3 years. In the event that the validity period expires, you can apply for another cadastral decision for the same purpose to be applied for.
- A comprehensive code that combines everything related to residential buildings intended for one or two families, whose height does not exceed three floors.
- Setting the minimum requirements and requirements that achieve safety through the durability, stability and stability of buildings and facilities, facilitating access to them and protecting lives and property from the dangers of fire, earthquakes and other risks associated with buildings.
- A set of conditions and requirements and what follows from implementing regulations and appendices related to building and construction to ensure safety.