Displayed 401 - 410 of 823
FAQ
Is the Mayor’s approval required to issue a certified report for an unscheduled project coordination request?
Yes, the Mayor’s approval is required to issue a certified coordination report for an unscheduled project, based on the municipality’s settings. This approval is granted after obtaining consent from the relevant authorities and the Projects Coordination Office at the Municipality.
FAQ
Is the QR code service specific to a specific activity?
QR code service includes all activities.
FAQ
?Is the service applied in all municipalities across the Kingdom
Yes, the service is applied in all municipalities, and the scope of enforcement can be known through the Geographical Explorer of the building compliance certificate.
FAQ
Is the service for changing the supervising office or contractor available through the Balady mobile app?
No, this service is only available through the Balady platform.
FAQ
Is the validity of a non-Saudi worker's residency checked when applying for a seasonal health certificate?
The system can verify residency expiration if the municipality enables this feature in its settings. If not enabled, residency expiration is not checked.
FAQ
Is the vehicle's location always visible on the map?
The vehicle’s location appears on the map only if the driver has enabled GPS location services on their mobile device. If GPS is disabled, the request status can still be viewed, but the vehicle’s location will not be displayed.
FAQ
?Is there a conflict in requirements between the Compliance Certificate and the special building code applied in some neighborhoods (such as the Diriyah building code)
No conflict between the CBC certificate requirements and other codes.
FAQ
Is there a difference between the official documents required for transporter registration and contractor registration?
Yes, there is a difference between the official documents required for transporter
registration and those required for contractor registration.
registration and those required for contractor registration.
FAQ
Is there a difference in fees between a regular excavation permit and a pre-coordinated excavation permit?
No, there is no difference in fees between a standard excavation permit and a pre-coordinated excavation permit. However, obtaining a multi-coordination report currently does not incur any charges.
FAQ
Is there a fee for applying for the municipal service?
There may be fees for some classifications of municipal service applications, which are defined by the responsible employee in the concerned department, as the application will be canceled if the fees are not paid on time.