Displayed 361 - 370 of 823
FAQ
Is approval from the Emirate of Medina required to bury a deceased person in Al-Baqi Cemetery if the death occurred outside Medina?
Yes, approval from the Emirate is required. The deceased's family must apply through the
Emirate’s website, and an automated verification system between the Emirate and Balady platform ensures approval without the need for manual documentation.
Emirate’s website, and an automated verification system between the Emirate and Balady platform ensures approval without the need for manual documentation.
FAQ
Is coordination with any other authority required after obtaining an excavation permit?
According to official directives, all government entities must be electronically linked with the Balady platform to facilitate municipal services, eliminate the need for repeated coordination, and avoid paper-based approvals through the Non-Objection Platform (Government Approvals).
FAQ
Is issuing a cadastral decision a requirement for the technical report service?
Yes, you can issue a technical report with a license or cadastral decision, according to the (required purpose).
FAQ
Is it mandatory for female workers to have their health certificate photo taken without a face covering (niqab) if their facial features are clearly visible?
The health certificate photo follows the same regulations as civil registry photos, similar to other official documents. The certificate must display a clear and identifiable photo of the holder.
FAQ
Is it necessary to enter all details of the deceased when inquiring about a grave?
No, only the name or part of the name is sufficient for searching. However, to narrow down search results, it is recommended to use additional details such as ID number or date of birth.
FAQ
?Is it necessary to have a Building Compliance Certificate when purchasing a residential or commercial property
It is not from the requirements of buying or selling a property nor is it required, but it is better to make sure it is available.
FAQ
FAQ
Is it necessary to rectify an existing building to apply the current building code?
The possibility of applying the Saudi Building Code to existing buildings is according to the engineering office’s report.
FAQ
Is it possible for a contract to be included in two operational plans?
Yes, provided that there is no time conflict.